News article
Horiguchi-en builds matcha grinding facility in Shibushi, Kagoshima
Horiguchi-en is constructing a new grinding and processing facility (SGP) in Shibushi, Kagoshima, with 1,547 m² of building space and ¥1.9 billion investment, designed to handle 800 tonnes of matcha annually. The plant addresses grinding capacity constraints amid global matcha demand by integrating tea cultivation, tencha production, and powder processing under one operation, enabling cost reduction and expedited fulfillment while supporting overseas export from Shibushi port…
Key points
- Horiguchi-en investing ¥1.9 billion in new SGP grinding facility in Shibushi, Kagoshima; planned annual capacity 800 ton…
- Vertical integration: in-house tea garden management through tencha production to grinding eliminates supply-chain bottl…
- Facility supports real-time processing, faster delivery, and cost reduction; export operations planned via Shibushi port
Read the full article at the source ↗
You're reading the free briefing — upgrade to unlock every story and read any full article in English, one click.
About this article
The numbers
Site area: 3864㎡
Building area: 1547㎡
Investment amount: ~¥1.9 billion
Annual grinding capacity: 800 tonnes
What they said
“To respond to increased supply accompanying the global matcha boom, we aim to strengthen grinding processing capacity, which has become a bottleneck”
世界的な抹茶ブームに伴う供給量増加に対応し、ボトルネックとなっている粉砕加工処理能力の強化を図る
Unlock every story on Matcha Wire.
All articles open, plus read any full article in English in
one click — $75/mo, cancel anytime.
See what you get →
Comments
Create a free account or sign in to join the conversation.
Be the first to comment.